As spring summer autumn so shy, so tell, so to winter. A gust of wind fluttering, leaves, autumn cicada Diming, although the decline, but pregnant with hope, though withered, is pregnant with the harvest.
Since September, the road branch company has been busy up and down. A project followed, branch leadership in order to arrange the construction schedule, our class pavement work diligently to finish a project task: new middle school new, Fumin road transformation, the transformation of Maoshan toll station, South Street reconstruction project. Every completed project contains our earnest sweat.
In the face of these projects, we face these projects, we are strict in demands; hardworking; in the face of these works, we dare to challenge. Because every project is related to our company's reputation, we don't dare to slow down. Whenever there is a quality problem of a project, will produce the butterfly effect on the development of the company, so the company leadership team, the quality requirements of our alarm bells ringing.
During the construction process, we found that when there are cold and hard materials in the paver, we will ask the outer contractor to remove and fill the materials in time. If we find that the pavement is high or low or not smooth, we will adjust the position of the paver's ironing plate in time. When it is found that the paver has oil leakage, we will check the repair troubleshooting in time. We absolutely don't let any of the problems that affect the quality of the construction.
We believe that God helps those who help themselves to pay, will make a more brilliant tomorrow of Changzhou municipal. |