在线看视频_正能量视频www正能量不用下载 _男女做爰的过程图片_爱爱好爽我好想要进去

homepage  |  Favorites  |  Chinese  |   weixin
Current position -> News -> Access to information

Access to information

Strengthen quality control and find breakthrough in improving quality
The publisher:czszjs    Release time:2017-06-27    Hit:20158

 

"Huangliang Bang" QC group "to improve the preparation of the implementation of inspection well construction quality qualified rate" project won the national municipal engineering QC group first prize
As a construction enterprise, in every project we deeply understand the importance of the quality of the project for the development of enterprises, the project quality is the priority among priorities in the construction management work, is the relationship between the development of enterprises, establish credibility, an important industry to win the market, but also a very important part of the whole work the quality of the project, only to strengthen the control to a good grasp of the progress, cost and material control in the whole construction process of construction.
Through the QC activities, how to find a breakthrough in engineering quality, thus ensuring the quality of our overall construction work standards, as we need to overcome a technical issue. When the boy Henan road the project implementation to our shoulders, we begin by meeting and go out, please come to visit and study the whole team of "engineering quality is the life of enterprise, is the core of" the soul of enterprise development and competition to fully understand this sentence, understand, make full to achieve unity of thinking. Then, once again stressed the importance of the team, a difficult one to head can be said to be difficult, but put it down to each member of the team who, will no longer be difficult after, team members benefit by mutual discussion about "how to improve project quality, how to improve, from what position finally, we think that" improve the municipal road running after a period of time, such as cracking of asphalt pavement damage, sinking around inspection wells, is a common phenomenon, more influence factors of this problem, the construction experience of the old hard to better solve the above problems, this requires earnest investigation and comprehensive analysis to identify factors. Then in order to take corresponding measures to solve the problem, then the team decided to "improve the quality of inspection well construction qualification rate" as a research topic for study and research The.
In the leadership of the company and departments under the guidance, we investigated and analyzed the causes of the disease, to find out the cause of the problem, decided to adopt the "shop through the construction process of lime soil pressure" of the traditional technology was improved, through the experiment, this improvement solves the borehole lime soil compaction degree difference and flatness poor quality problems, and improve the economy of the whole project to a certain extent, improve the system of construction technology has been recognized and praised, won the two prize of provincial QC results. From June 19th to June 21st, carried out by "Huangliang Robinson" QC team prepared "to improve the quality of inspection well construction qualification rate" issue in the first prize of excellent quality management talent shows itself, won the national team of Chengdu municipal engineering construction, to improve the market competitiveness of enterprises at the same time, also provides practical experience and valuable experience for the management of QC project team members the research work, the quality of a project.

 
 

Print this page || Close the window

Jiangsu province Changzhou City Blue Ocean 158 North Road| Zip code:213017 | Telephone:0086-0519-85501558 | Fax:0086-0519-85501558 | E-mail:czsz@czszjt.com

Copyright © CHANGZHOU MUNICIPAL ADMINISTRATION CONSTRUCTION ENGINEERING CO.,LTD.  蘇ICP備12078434號-1   Technical support:Public science and technology