2015 the first day of work, the road branch of the leadership assigned me and gold master to go to Hangzhou with the paving machine repair. In March 8th we set foot on the train to Hangzhou. This trip for the first time I was in the factory is a rare opportunity to learn, in the mind there is a kind of excitement. In the afternoon, we arrived at the Hangzhou union road machinery maintenance Co., Ltd in 3. Wang director and director of the warm welcome to our. When we see our stand, I can not recognize, because it has been disintegrated, leaving only the walking system and part of the stent.
The first day came to the workshop, just met a few workshop maintenance master in cleaning our engine, I first saw the true face of the spreading machine, I have a kind of like when I get married I unlock my wife's veil of excitement, the original engine is long this way. Look at the master's skilled in the engine cleaning, installation, commissioning. I have a better understanding of the engine and understanding, I from time to time to ask some questions such as: the engine's working principle, what will cause the engine power shortage, the engine usually how to maintain? The teachers are very enthusiastic to explain to me: diesel engine process is in fact the same as the gasoline engine, each working cycle is also experiencing the intake, compression, power, and exhaust four stroke. Cause the engine power shortage has many reasons, such as fuel can not burn, it may be a high pressure oil pump is broken, and so many reasons. Like the daily maintenance, as long as the attention of the replacement of oil can be, the general provision of a period of 250 hours or 6 months.
In the subsequent maintenance process, I learned a lot of things in the last year, the high intensity of work and working hours, our machine is scarred, such as engine oil loss is large, there is a hydraulic oil leakage, power shortage and other serious impact on the normal operation of the problem. And tubing aging, poly thermal duct seriously damaged, there is also a lot of asphalt scrap seriously affect poly the normal work of the hot air duct. There are also the deformation of the dragon, row material wear, floor wear, wear and tear, wear and tear, etc. all kinds of wear and tear of the need to repair replacement.
In the maintenance process of the gold master carefully to the director of the factory in the maintenance of a variety of work in front of the problem, Wang also carefully and patiently for us to explain the causes of these problems, which may be part of the problem. In order to make the performance of the spread to the best condition, we both sides to make every effort to remove all the possible problems.
2015 new year, our company has a more difficult project tasks, and the completion of these tasks are very important to the work of the job is a key, I and master to come here, is to ensure that the company can open the door to the new year in the new year. I believe we can accomplish this important and glorious task. (Lu Caizhi)
I grew up in the maintenance of knowledge and skills
Grew up in the maintenance of knowledge and skills I |