Suzhou world campus center loop length of a project is located in Suzhou City Industrial Park, started construction in November 8, 2012, but the construction period due to the road red line within the trees the slower migrating, influenced the early stage of construction. Our project department in the project according to the practical situation, determine the first construction construction can be two of the box culvert and Jinji Lake Avenue to the south of the road and landscape heap of earth excavation and ballast replacement work.
Project technology personnel at the scene full control of pile foundation construction of box culvert, penetration data at any time when the pile into the observation, to determine the pile into the length and stop time, to ensure the construction quality of pile. We have finished all pile construction north and South River Bridge longitudinal longitudinal River bridge. Can meet the design and specification requirements in testing integrity of pile and bearing capacity test of single pile. We have begun to steel processing box culvert substructure, pouring concrete for slab, progress adequately respond to the request of the owner.
Earthworks and ballast road and landscape stack replacement is a huge workload, coupled with the recent weather is cold and rainy, seriously affecting the earthwork construction, all staff of project department to overcome the severe cold in the deputy project manager under the leadership of Feng Qiule, to the sunny day, not much gas, do day in and day out, ensure the work all day sixteen hours, earth excavation. Excavation management personnel on-site command, the excavated earthwork piled separately according to different quality, set aside a relatively high quality soil, lime soil source as later. The young technician project department and the interns take turns to work overtime, do the construction site did not stop machine, management does not come off sentry duty, make full use of the time available. We have completed the road earthwork excavation 5000 cubic, ballast exchange fill earthwork 30000 cubic. Landscape pile of earthwork excavation 30000 cubic, ballast exchange soil million cubic meters, has laid a good foundation for the entire project completed on schedule.
In the field of construction, the project department to unite as a whole, a life of mutual care, help each other work, we believe that we can overcome all difficulties, finish the construction task. To meet the requirements of the owner.
Suzhou circle loop length of a project
Wu Hongliang |